Paint wait times

Posted: July 20, 2012 By: yosemitedale

Home Forums Ask Eastwood Paint wait times

Viewing 1 post (of 1 total)
  • Author

    Posts

  • #34418

    yosemitedale

    Member

    Greetings all,

    I just purchased the Eastwood primer, urethane colour coat, and the clearcoat to go with it.

    Can someone who has actually used these products give me advice on the following;

    1) Is it necessary to scuff the old finish with perhaps 400 grit before I put primer on?
    2) How long should I wait for the primer to dry before I put on the colour coat?
    3) How long should I wait in between the multiple light coats of the colour coat?
    4) How long should I wait before applying the first clear coat layer?
    5) How long should I wait before I can buff the clear coat?

    It’s summer now, and the temperature on average is about 75-80 degrees F.

    Thanks in advance for the tips.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.

Top Selling Products

Comments are closed