last project

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #33130
    thebighammer
    Member

    i painted two so far the third is in the booth now it takes about 74 hours from start to finish 24 hours of tapeing . its omaha orange and charcoal gray they are for the pa turnpike.the booth is huge it is airless air assist. it hydraulic pressure of 1500 psi and 10 psi air pressure its painting on the run .it really puts out the paint.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.
Back to top button